bluedog
05-11-2007, 03:38 AM
It's been almost 2 weeks but today I had a good 3.5 hrs. to spend on my rear drawer set up and made some good progress. My 36" slides arrived so I was able to get to the meat of the unit, the actual drawer and a hinged lid for the front section. My goal is to have it all buttoned up by next Thursday.
http://img.photobucket.com/albums/v462/bikewrench/drawerphaseII1Small.jpg
http://img.photobucket.com/albums/v462/bikewrench/drawerphaseII2Small.jpg
I decided to do a double hinge lid (I only have one done) for easier access from the rear passenger door. I figure this will be a great place for an inverter.
http://img.photobucket.com/albums/v462/bikewrench/drwaerphaseII3Small.jpg
http://img.photobucket.com/albums/v462/bikewrench/drawerphaseII1Small.jpg
http://img.photobucket.com/albums/v462/bikewrench/drawerphaseII2Small.jpg
I decided to do a double hinge lid (I only have one done) for easier access from the rear passenger door. I figure this will be a great place for an inverter.
http://img.photobucket.com/albums/v462/bikewrench/drwaerphaseII3Small.jpg