Nothing to update with project burb. But project work 250 had its rad **** the bed. So waiting on a new one. Then its on to a 3" leveling kit, 2" body lift and some visual upgrades like a 2 tone paint job, some lighting upgrades and 35s new wheels and interior doo dads.
Being a 2wd, I figure the best way to make it look like a 4wd is a quick leveling and body lift combo.
Well, found out the transmission cooler mount corroded off and the trans cooler popped a hole in my rad. I have to keep an eye on that from now on. monthly inspections on that one for sure. Then its back to the lift, wheels, and other items. Plus turning it into a rolling billboard for my new business.