Page 4 of 4 FirstFirst ... 234

Thread: Basic wiring question

  1. #31
    Join Date
    Nov 2010
    Location
    Middle of Nowhere, Outer Skin of Space Ship Earth, 1 A.U. from Sol, Outskirts of Milky Way.
    Posts
    2,096
    Quote Originally Posted by keezer37 View Post
    The thing to consider is, to what extent is this detrimental? Is this really a concern?
    Depends.

    In your example, the FLA takes 18 hours to fully absorb, but the AGM is done in 3. So, if they are hooked together, the AGM will be held at absorb voltage (14.2 on your charger?) for 15 hours longer than it needs until the FLA is done simmering.

    If it's cold out, it probably won't hurt it, but if it's hot out, then it might pop the blowoff valve and the AGM would lose water and the life would be shortened.
    ...
    ...
    Current: 76 E-250, bubble-top, self-contained|couple of old Yamaha enduros
    Previous wheelers: 41 Willys|78 FJ40|78 Bronco|84 Bronco|74 Ramcharger|78 Ramcharger|79 D150 PowerWagon|77 D100|79 D400 dually, converted to 4WD, utility bed, 10' Lance|75 Westy|69 Scout, RHD|bunch of others|bunch of bikes|couple of boats|couple of motorhomes|blah blah|so what|not my idea|just doin' what I'm told|wank wank|this space for rent|candy is dandy|but liquor is quicker

  2. #32
    Join Date
    Nov 2007
    Location
    Scottsdale, AZ
    Posts
    1,517
    Quote Originally Posted by dwh View Post
    Different levels? As in one more drained than the other?
    Yes one is drained more then the other but the same size and make.

    The reason I ask is I'm upgrading my vehicle solar set-up and I have the option of using a 3-stage with all stages adjustable or your basic bring it up to voltage and then float controller.
    "Knowledge without experience is just information"--Mark Twain

Page 4 of 4 FirstFirst ... 234

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •