I ran the XM/Sirius antenna under some 3M anti-skid. Very strong stuff, should keep it there with out moving and protect it from anything put on the roof rack (if it ever gets here). Finished the gas lines, realized a mistake was made so have to redo it today, top feed instead of bottom feed. Installed new TV wall mount, still have to run cable to it. Installed aluminum floor barrier/insulation and the Restava 8-inch memory foam mattress with two pillows. Closed the interior, hoping not to go in again. In and out of that sucker 10K times if once. Back is killing me, lol.
Do not have enough insert for the trim, will pick that up tomorrow with the other side handrail, and will install both. Do the trim and then do the silicone on the outside and look at the bottom for any areas missed. Fill with water and propane and see where the leaks are. Install the back sliding doors. I am doing them like my original idea of all fiberglass, much stronger and will stay clean easier. Had thought about doing it the same as the upper wood, but feel it would get dirty and never come clean and be far easier to break.
Change in plans on the graphics. Will not be done until Tuesday now. The guy is out of town teaching classes on vinyl wrapping. Goes all over the world, supposedly one of the best, trained by the originator of wrapping while stationed in Europe years ago. Pretty amazing, the money he makes for the classes.
Have to have it wrapped up by end of day Tuesday, so back to work. - Bob
![]()








Reply With Quote








