Due to things out of my control I was forced to move my trip back a couple weeks the only plus side to this is I get to finish most of the stuff I have in mind up in till now I have been frantically working on this beast with hopes of finishing it by June 1st to have lots of time to test it well in a perfect world it would be done but I still made a lot of progress here are some pics of the water tank and fuel tank
I now have 65ish gals of water and fuel with two fuel pic up one for the motor and one for the Espar heater I also got my water condensing tank for the a/c put in and lines hooked up
Sent from my iPhone using Tapatalk